Planned Settlement: Q4 2025

Pioneer Townhomes 1A

Homes 101–110: Tiling and flooring have been completed. The shower screens have been installed, and soft landscaping is currently ongoing.
Homes 133–136: Painting, tiling, and flooring have all been completed. Soft landscaping is scheduled to commence soon.
Homes 126–132: Joinery has been completed, and the stone benchtops have been installed. Soft landscaping is currently ongoing.
Homes 137-138: Joinery, tiling, and flooring have been completed. Painting is currently ongoing.